Software Size Estimation

September 30, 07 by admin

Software Project Estimation [1]

  • You can’t manage something which you can’t measure
  • We need some sort of measurement for:
    • size of the project
    • effort and cost
  • Estimating software projects is notoriously poor.
  • If performance doesn’t meet estimates then either:
    • the performance was poor; or
    • the estimate was poor

Impact on Development Process [1]

  • One of the key factors in software project management
  • If “software managers and engineers are trained in and apply software estimating and planning procedures”, then you are one step closer to CMM level 2 (repeatable).

Lines of Code [1]

  • The most commonly used size indicator, but obviously not the best one!
  • Issues:
    • How can lines of code be defined?
    • How can the total lines of code be known before coding?
    • How interpret lines of code? Is 250 more productive than 200?
    • What about different programming languages which have a different syntax?

Lines of Code Calculation [1]

  • Prerequisite for line of code calculations is the work breakdown structure
  • Line = statement
  • Line = data definition
  • Line != comments
  • Line != debug code
  • Line != test cases
  • For different languages, convert all to assembly.

Beta Distribution Measurement [1]

  • Ask developers for the following line of code values:
  • Optimistic (0)
  • Pessimistic (P)
  • Realistic (R)

LOC = (O+P+4*R)/6

  • ex: R=250, O=200, P=400
    • LOC = 266

The Blitz [1]

  • Based on historical observation of previous projects.

LOC = Processes * prgs/processes * avg. prg size

  • Process = class, db table, …
  • Ex: 20 classes, 1 program/class, 50 java lines of code/program
    • LOC = 20*1*50 = 1000

Wideband Delphi [1]

  • Based on the experience of developers
  1. Gather experts
  2. Conduct group discussion
  3. Gather estimates
  4. Distribute estimates
  5. Repeat until consensus is reached
  • Pros:
    • Takes advantage of experience
    • educates developers about the software
    • reinforces team concept

Function Points [1]

  • Uses the functionality of the software as a measure of its complexity.
  • Analogy: For a given house, we can say how many square meters it has (lines of code) or we can say how many bedrooms and bathrooms it has (function points).
  • A measure of the functionality of a given software.
  • Works best for traditional applications; not very suitable for algorithmically intensive applications. (ex: real-time and embedded applications)

Weighting Factor [1]

  • There are tables that provide the project manager with a weighting factor for each category.
  • Input can be:
    • Simple (weighting factor=4)
    • Average (weighting factor=5)
    • Complex (weighting factor=7)
  • Ex: 1 to 5 data items referenced from 1 file is considered a simple function. Same action from 5 files is considered average.
  • Sum of all weighted categories is the raw function points.

Environmental Factors [1]

  • Data Communications
  • Distributed Computing
  • Performance Requirements
  • Constrained Configuration
  • Transaction Rate
  • Re-usability
  • Ease of Operation
  • And much more…
  • For a given project, each factor is rated from 0 (no effect) to 5 (highly affects).
  • Sum of all gives the environmental influence factor (N)

Adjustments

  • Complexity Adjustment Factor (CAF)
    • Assumes a +-35% inaccuracy in early estimates; therefore:

CAF = 0.65 + 0.01*N

  • Adjusted Function Points (AFP)

AFP = CAF * rawFunctionPoints

  • Convert to lines of code using tables

Differences with Function Point [1]

  • Also includes number of algorithms
    • weighting factor for an algorithm is 3
  • Uses average weighting factors instead of simple, average, and complex values.
  • Uses 2 environmental factors: logical complexity and data complexity.
  • CAF is calculated using a table.

Object Points

  • Uses a similar process to function points and feature points.
  • Suits object-oriented software.
  • Uses different weighting factors and tables.

[1] Prof. Shervin Shirmohammadi, University of Ottawa SEG4100 Course Notes, Lecture 5

This entry no have comments... but you can be first.